Grid & Connection

Export is measured at the boundary

Generation, site use and net grid flow are different readings.

Export is measured at the boundarySolar and a battery sit inside a conceptual site boundary with site loads. The connection point separates the site from the grid. A separate approval document governs permitted flow; arrows show possible paths, not a measured operating state.Behind the meterBattery1Loads2Net flowGrid34Approval
Conceptual energy paths; power-conversion equipment omitted. Not wiring or an approved layout. The site approval defines the export arrangement.
Explore the numbered points

POINT 1

Not all generation is export

Solar may serve site loads or charge a battery behind the connection point, subject to the approved design and equipment controls.

POINT 2

Read the load at the same time

Site demand and battery charging can reduce net export. A low export reading alone does not identify an export-control fault.

POINT 3

Net flow is the boundary reading

The export arrangement applies at the connection point named by the approval. Keep the measurement location, phase arrangement and timestamps with the reading.

POINT 4

Read every approved constraint

Export, inverter, generation and storage constraints may differ. Fixed, zero and flexible arrangements also have different controls and fallback conditions.

Use it in the field

FROM THE DIAGRAM TO THE JOB

Keep these checks with you.

  1. Keep the actual approval

    Record its address, reference, issue date, operating mode and each stated constraint—not a neighbouring site's setting.

  2. Capture a shared timestamp

    Keep inverter power, battery power, site load and grid flow together with equipment and communications state.

  3. Preserve settings as found

    If the approval, network requirements or manufacturer instructions conflict, preserve the state and escalate rather than guessing.

An export limit is not, by itself, a system-size permission.

Read the guide's sources
Sources listedReviewed August 2026Our methodology
Article details and scope
Topic
Solar export limiting
Applies to
Grid-connected systems (Australia)
Reading time
About 5 minutes
Neutrality
Manufacturer-neutral
Read the full explainer
Key takeaways
  • Read the connection approval as a set of separate constraints: export, inverter, generation and storage limits may differ, but do not assume they are independent unless the approval says so.
  • Fixed, zero and flexible export schemes use different equipment, communications and fallback behaviour. Verify the current network requirements and approved models for the exact address.
  • On site, preserve the approval, as-found settings, meter topology, phase arrangement, timestamps and grid-flow evidence before changing anything or escalating a suspected export fault.

Start with the connection point

An export limit governs the net power permitted to flow from the premises into the grid at the connection point. Solar may still serve loads or charge a battery behind that point, subject to the approved design and equipment controls. The approval may separately constrain inverter capacity, generation, storage, import or export, so record every field rather than treating one number as the whole connection.

The authoritative value is the current connection approval for the address. State summaries, neighbouring systems and remembered defaults are useful prompts only; they are not commissioning evidence.

Why limits differ

Electricity networks use connection conditions to manage voltage, power quality and available network capacity as customer generation and storage grow. The offered connection can therefore vary by network area, local conditions, application type, phase arrangement and approved equipment.

Do not tell a customer that an export limit is imposed only because their street is "full" or that a larger limit is guaranteed after a network upgrade. Capture what the network approved and direct policy or capacity questions to the network.

Fixed, zero and flexible arrangements

A fixed export limit uses a constant approved cap. A zero-export arrangement is intended to prevent net export, using the approved control scheme and measurement at the connection point. Do not promise that metered flow will be numerically zero at every instant; the applicable technical requirements define the control response and tolerances.

A flexible or dynamic connection can vary import or export limits with network conditions. Western Power describes dynamic operating envelopes as adjusting limits in near real time. SA Power Networks currently offers flexible exports state-wide for applicable new or upgraded systems and warns that actual capacity may be below the scheme maximum. These examples show why the network, address and application date matter.

CSIP-AUS provides a common Australian communications profile used in some dynamic connection schemes. Its use does not make every inverter, gateway or site eligible. Confirm the scheme's current approved-equipment list, firmware, gateway, internet and commissioning requirements.

What to capture on site

  • Connection approval or reference, issue date, address and approved operating mode.
  • All stated inverter, generation, storage, import and export limits, including per-phase wording.
  • Exact inverter, controller, meter or current-sensor models and firmware where visible.
  • Meter and sensor location, orientation, phase mapping and communications state.
  • As-found export settings before any authorised change.
  • Timestamped inverter power, battery power, site load and grid-flow readings taken together.
  • Active alarms, event logs and the network or manufacturer commissioning result.

A low-export reading on its own does not prove that export control is faulty. Site load, battery charging, available solar, grid voltage, a flexible setpoint, communications state and equipment derating can all affect the observed flow.

Keep commissioning inside authority

Do not copy a setting from another site or use this guide to choose a control mode. A licensed worker should follow the live connection approval, current network technical requirements and the manufacturer's instructions for the exact equipment. If those sources conflict or are unavailable, preserve the as-found state and escalate rather than guessing.

For planning only, use the solar system size calculator and payback calculator with the site's actual approved export arrangement. Results are estimates, not connection approvals or certificates.

New to the jargon? Browse the glossary.

Sources

Best next action

Did this help you move the job forward?

Tell us what is missing
Good to know

Frequently asked

Does an export limit determine the system size I can install?
Not necessarily. A connection approval may state separate limits for export, inverter capacity, generation and storage, or combine them in network-specific ways. Read every approved value and condition; never infer the permitted system size from the export number alone.
Who sets the export limit?
The relevant electricity network sets the connection conditions for the address. The retailer may determine what exported energy is worth, but the network connection approval is the authority for the export arrangement. Limits and available connection options can change with location, equipment and application type.
How is flexible export different from fixed export?
A fixed scheme uses a constant approved cap. A flexible or dynamic scheme can vary the permitted import or export with network conditions and normally depends on compatible equipment and communications. Its maximum, minimum and communications-failure behaviour are scheme-specific—check the live approval and network instructions.