Post-Storm Solar System Check
A safe ground-level check after hail, wind, lightning, flooding or debris impact, with clear stop conditions.
Safety boundaryRead first
Do not climb onto the roof, touch wet or damaged electrical equipment, approach fallen conductors or operate flooded equipment.
Safety boundary
Do not climb onto the roof, touch wet or damaged electrical equipment, approach fallen conductors or operate flooded equipment.
Field runner
Make the area safeWork one stage at a time
Stage 1 of 30/9 checked
Make the area safe
Evidence handoff
Keep the evidence with the job
These device-local checks are working state, not evidence. Save actual readings, observations and the outcome in a job record.
Start job recordView the complete procedure
01
Make the area safe
- Keep clear of fallen conductors, damaged modules, loose metalwork and flooded equipment.
- Contact emergency or network services where public electrical hazards are present.
- Do not rely on a dark display as proof that DC equipment is de-energised.
02
Observe from a safe position
- Record visible debris, broken glass, movement, water ingress and equipment alerts.
- Capture the time, storm type and any outage or surge evidence.
- Do not clean, move or reconnect damaged components.
03
Arrange assessment
- Provide photographs and system details to an SAA-accredited solar installer.
- Ask for the required electrical and structural inspection scope to be confirmed.
- Keep the inspection findings and rectification evidence with the job.