Diagnose playbook
Solar Insulation or Earth-Leakage Alarm
Treat insulation and leakage warnings as safety events, record the conditions and hand over a useful evidence pack.
Safety boundaryRead first
Do not touch PV connectors, rooftop equipment, DC cabling or exposed metalwork associated with a suspected insulation fault.
Safety boundary
Do not touch PV connectors, rooftop equipment, DC cabling or exposed metalwork associated with a suspected insulation fault.
Field runner
Stop at observationWork one stage at a time
Stage 1 of 30/9 checked
Stop at observation
Evidence handoff
Keep the evidence with the job
These device-local checks are working state, not evidence. Save actual readings, observations and the outcome in a job record.
Start job recordView the complete procedure
01
Stop at observation
- Record the exact code and whether it appeared during rain, dew or other damp conditions.
- Photograph only safely accessible displays and visible damage from a safe position.
- Keep people away from damaged or suspect equipment.
02
Build the evidence
- Record model, array details, first occurrence and recurrence pattern.
- Preserve monitoring logs and any manufacturer notification.
- Do not clear a persistent alarm simply to restore production.
03
Licensed assessment
- Escalate to an SAA-accredited solar installer or licensed electrician.
- Testing, isolation and fault location belong to the licensed assessment.
- Return to service only through the responsible technical process.
Source ledger2 sources