Choose the distributor shown on the site record, then use its live page for connection rules, application requirements and approved settings. Wattbench does not cache a generic export limit.

Sources listedReviewed August 2026Our methodology

Fast authority handoff

Select the site state or territory, then confirm the distributor from the bill, NMI record or connection approval before opening its live requirements.

Field sequence

  1. 01

    Confirm the electricity distributor on the bill, NMI record or connection approval.

  2. 02

    Open that distributor’s live connection guidance before finalising the design.

  3. 03

    Keep the approved capacity, export conditions and required settings with the job evidence.

  4. 04

    Commission against the approval and record the as-built result.

Confirm the distributor from the site record before relying on a link. Embedded networks, remote grids and private networks may use a different authority and are not inferred here. The connection offer and site-specific approval override general web guidance.

ACT

1 network

NSW

3 networks

NT

1 network
NT

Power and Water Corporation

Official distributor connection surface. Confirm the site belongs to this network before use.

Open basic connection guidance

QLD

2 networks
QLD

Ergon Energy Network

Official distributor connection surface. Confirm the site belongs to this network before use.

Open DER connection guidance

SA

1 network

TAS

1 network

VIC

5 networks

WA

2 networks