Install to handoff
Commissioning and handover
Move from the installed system through functional checks to a record another competent person can understand.
Before you start
Have ready
- • Approved design and connection material
- • Exact installed equipment identity
- • Test, setting, monitoring and handover evidence
Leave with
- • Installed configuration and equipment identity
- • Settings and functional test results
- • Customer handover, unresolved items and ownership
Stop condition: Do not mark an item complete when it was not observed or verified. Leave unresolved work visible with a named follow-up owner.
Field path
This pack organises existing Wattbench material; it does not replace the underlying manufacturer instructions, current standards, connection approval or licensed judgement.