Install to handoff

Commissioning and handover

Move from the installed system through functional checks to a record another competent person can understand.

Before you start

Have ready

  • Approved design and connection material
  • Exact installed equipment identity
  • Test, setting, monitoring and handover evidence

Leave with

  • Installed configuration and equipment identity
  • Settings and functional test results
  • Customer handover, unresolved items and ownership

Stop condition: Do not mark an item complete when it was not observed or verified. Leave unresolved work visible with a named follow-up owner.

Field path

  1. 01 · nextRun the handover checklistCover equipment, tests, access, documents and unresolved work.
  2. 02Review the evidence packSee what makes the approved design, installed system and changes traceable.
  3. 03Start commissioning evidenceCapture identity, settings, tests, handover and open items.

This pack organises existing Wattbench material; it does not replace the underlying manufacturer instructions, current standards, connection approval or licensed judgement.