Commission the system
Structured checks for settings, metering, functional response and installed-system identity.
Start with
Field sequences2
Solar Commissioning Handover ChecklistA practical record of the information, access and evidence that should leave the site with the customer and installer team.Export Control or Meter Commissioning CheckA field record for systems that export unexpectedly, remain capped or show implausible power-flow direction.
Calculators and worksheets3
AC Voltage Rise WorksheetCompare two entered voltage readings and document the rise in volts and percentage without applying a compliance verdict.Essential Load ScheduleTurn entered continuous loads and daily run-times into a simple backup power and energy schedule.Three-Phase Load Balance WorksheetCompare entered phase currents, identify the highest and lowest phase, and quantify the spread without asserting a compliance limit.
Guides and references13
Network connection authoritiesOfficial Australian distributor connection pages for live approval and settings verification.Solar Export Limiting, ExplainedHow to read an Australian connection approval, distinguish fixed, zero and flexible export arrangements, and capture evidence without guessing network settings.Module and Inverter CompatibilityA complete compatibility check covering cold Voc, MPPT operation, current, parallel strings, connectors and exact model documentation.Battery Backup Architecture and Essential LoadsHow energy, power, transfer equipment and backed-up circuits combine to determine real outage behaviour.
Show 9 more
Export-Control CommissioningCommission export control from the connection approval through metering, CT direction, phase mapping and measured response.Solar and Battery Commissioning Evidence PacksWhat to retain so another competent person can understand the approved design, installed system, tests, changes and customer handover.AS/NZS 5033Installation and safety requirements for photovoltaic (PV) arrays: DC-side layout, isolation, maximum array voltage, earthing and signage.AS/NZS 4777.1Installation requirements for grid-connected energy systems via inverters.AS/NZS 3000The Wiring Rules: the overarching standard for the safety of electrical installations.AS/NZS 4777.2Inverter requirements for grid connection: anti-islanding, power quality, and voltage/frequency response, including the regional settings inverters ship with.AS/NZS 5139Safety of battery systems used with power conversion equipment: installation, location, and protection of battery energy storage.IEC 62446-1Requirements for testing, documentation and maintenance of grid-connected PV systems: commissioning tests and handover documentation.AS/NZS 4509Stand-alone power systems: design and installation of off-grid systems.