Approval to response

Grid and export control

Keep the connection authority, meter arrangement and observed response in one commissioning path.

Before you start

Have ready

  • Site-specific connection approval
  • Inverter, controller, meter and CT identity
  • Clear import, load and generation conditions for observations

Leave with

  • Approval and configured setting as found
  • CT direction, phase mapping and communications state
  • Observed response with timestamp and measurement point

Stop condition: Do not guess a network value or apply an undocumented setting. The live distributor page and the site-specific approval remain authoritative.

Field path

  1. 01 · nextConfirm the authorityGo to the official distributor connection surface for the live requirements.
  2. 02Run the meter checkRecord approval, CT direction, phase mapping, communications and response.
  3. 03Start export evidenceKeep settings as found, measurements and the final outcome together.

This pack organises existing Wattbench material; it does not replace the underlying manufacturer instructions, current standards, connection approval or licensed judgement.